Recent & past projects
List of our recent & past projects
- Shaw Core/Cantak Camrose:
Size: 20” x 10.33 mm F.B.E. Abraison
20” x 7.3 mm F.B.E. - Enbridge:
F.B.E. abresive coating coupons and rebeveling
Size: 36” 750 mm - Evraz:
Cutting and beveling
Size: 36” .750 mm - Dynamic Steel:
Yellow jacket refurbishing
Size: 8” - Comco Cold Cutting Compound:
Compound bevels;
Size: 12-16” heavy wall - OPTI Long Lake Project:
Refurbishing Stainless Steel pipe, fittings, elbows, tees, valves.
Size: 2-24” - Tenaris Global Services:
Sandblast Drill Stem, 200,000 ft of 2.875”. - ACCESS Pipeline/Garneau:
Lab samples, cutting, beveling.
Size: 24-30” - ACCESS Pipeline:
Cutting, beveling, Lab samples.
Size: 16-24”
Length: 350 Km - Westlund Yellowknife, NWT:
Victaulic cut groove.
Size: 12” 40,000 ft - DeBeers Diamond Mine Snap Lake:
Snap Lake Project; Victaulic Grooving
Size: 3-16” - ENCANA, Camrose:
Inspection and Repairs;
Size: 4”
Length: 18,000 m - Reliable Welding:
Pipe cut, bevel, re-bundle;
Size: 4”. ERW
Length: 80,000 ft
For inquiry or price quote, please contact
Mike McAllister:
Phone: 780-499-0823
Email: csmpipe@shaw.ca
- Date modified: